As an important lifting conveyor, bucket elevator for limestone plays an important role in the production. If the operator is not in accordance with the norms of operation or the latter part of the maintenance is not in place, both work efficiency and service life will be greatly reduced, seriously it will result in production accidents occurred. Properly safe use of bucket elevator for limestone can extend its service life and avoid failure in the use process. Only regular maintenance can ensure the normal use of bucket elevator. Following the bucket elevator to introduce the following points of attention to the operation and maintenance of attention. Here I introduce some points about the bucket elevator attention matters.
Considerations of bucket elevator for limestone operation
1 The bucket elevator for limestone and the key of the power switch box are maintained and managed by the designated personnel.
2 The bucket elevator for limestone must have hoisting limiter and a stroke limiter, limiter should make the pulley in ascension to distance the drum or pulley 300mm before can automatically stop.
3 Bucket elevator should have the maximum load mark, lifting weight is not allowed to overload (1T) in the lifting and landing process.
4 After transmission, check hoisting limiter, stroke limit of a device, the interlock switch and other safety devices, ensure they are sensitive and reliable and tried to lift.
5 Before lifting ring, landing, functionary must warn.
6 Lifting machine is not allowed to manned.
7 After the work is finished, the hoisting machine hanging plate should be born, and then cut off the power supply, close up and down the fence door.
8 Maintain the surrounding environment of the elevator.
The daily maintenance of any machine is very important, good maintenance can extend the life of the machine, bring more economic benefits.
Maintenance of bucket elevator for limestone
1 Bucket elevator should be empty load drive. So the machine should be discharged in all the hopper of the material before stopping every time, and then stop.
2 Bucket elevator can not be reversed, reverse may occur in the chain derailment phenomenon and eliminate the derailment fault is very troublesome.
3 Uniform feeding, no sudden increase of feed quantity. The feeding amount can not exceed the capacity of lifting and conveying machine. Otherwise, it is easy to cause the bottom of the accumulation of serious "stuffy car" accident.
4 Add oil in time.
5 chain and hopper serious wear or damaged should be replaced in a timely manner.
The bucket elevator for limestone produced by ZK has a great improvement in performance and appearance, it resolve the long-standing we restrict that bucket type lifting machine can not carry out the problems of continuous operation in a long cycle, In addition, the operation and maintenance is improved, effectively reduce the security risks and the operator of equipment maintenance, reduce the production cost in a large extent and bring greater economic benefits for enterprises.