Mine vibrating screen for ore production line

Date:2017-08-25 Source:zk corp Views:

Mine vibrating screen is a work in the ore production line equipment, its work efficiency is very high, but also divided into many levels, each level has a related role; it is divided into the ore production line grinding and grinding two forms of conventional abrasive shaker are three sections of a closed-circuit view and control sieving, with nothing to contact with the ball, just to manipulate the broken product size. Semi-self-grinding ball mill before the linear vibrating screen, is to screen out the stone.
Under normal circumstances, a grinding ball mill with spiral classifier, cyclone, linear vibrating screen and other equipment constitute a closed-circuit grinding, that is, the ball mill through the linear vibrating screen classification, sieve material into the next work, sieve the material is back again. From the rated power point of view, the cyclone and linear vibrating screen classification power is better than the spiral classifier, grading power is high, mean that the ore material again back to the ball mill (return to the sand)reduce, so under the ball mill standard unchanged (The volume of the cylinder), the amount of new ore into the mill can be added, the relative processing capacity of the ball mill is added, and the consumption of the unit ore is reduced, which is beneficial to the decrease of the production cost.
Mine vibrating screen at the start must first view:
1. Each part is fixed not tight, cannot show loosening of the scene;
2. The motor is not the addition of lubricants;
3. The first key under the power to see the direction of the motor is not accurate;
4. The staff first away from the equipment, to work properly near the sieve machine.
In addition, if the slurry into the ball mill before add the screening process, the intention is to be qualified in advance of the fine fineness of the material out to reduce the amount of slurry into the ball mill (which has contained some qualified particle size), with the reduction of ore over grinding, so that both play the intention of saving energy and avoid the ore over mill may bring the impact of the follow-up sorting process.
 

Message

InquiryYou can get the price list and we will contact you within one business day!

Name:*
Country:
E-mail:*
Cellphone:
Capacity:*
Raw Material:
Message:*
WhatsApp
+86 18037866379
WeChat
+86 18037866379

Contact Us