50,000 t/a Active Lime Project in Congo, Africa
50,000 t/a
Congo, Africa
Project Address: Africa•Congo (Brazzaville)
Construction Unit: China National Gold Group Co., Ltd.
Product Name: Active Lime Production
Production Scale: active lime production line with an annual output of 50,000 tons
China National Gold Group Co., Ltd. (hereinafter referred to as China Gold) is the only central enterprise and the largest gold enterprise in my country's gold industry. It is the chairman unit of the China Gold Association, the first board member unit of the World Gold Association in China, and the China Committee of the World Gold Association Chairman unit, and the first batch of member units of "Shanghai Gold" to provide reference prices.
The purpose of this project is to build a lime shaft kiln in the Congo region of Africa to meet the needs of copper ore beneficiation.
Design Principles
(1) On the premise of meeting the requirements of production scale, the host adopts stand-alone and single-line equipment to achieve the purpose of smooth and compact production line, save land, and increase land use rate.
(2) The auxiliary equipment is based on the principles of stability, reliability and energy saving to ensure normal production, high quality, high yield and low energy consumption.
(3) Fully integrate the local natural conditions, optimize the design plan under the process and production conditions, and reduce the project cost as much as possible.
(4) Conscientiously implement relevant environmental protection, laws, regulations and standards, strictly control environmental pollution, reduce pollutant discharge, protect and improve the environment, and realize safe and civilized production.
Contact Us
Send message & get quote