• LECA PRODUCTION LINE
  • MAGNESIUM PRODUCTION LINE
  • ACTIVE LIME PRODUCTION LINE
  • CEMENT GRINDING STATION
  • CEMENT PRODUCTION LINE
  • LIME SLAKING PLANT
  • MAGNESIUM OXIDE (MgO) PLANT
  • LITHIUM PRODUCTION LINE
  • GYPSUM POWDER PRODUCTION LINE
  • ALUMINUM ASH PROCESSING SYSTEM
  • FRACTURING PROPPANT PRODUCTION LINE
  • SOLID (HAZARDOUS) WASTE INCINERATION SYSTEM
  • PULVERIZED COAL PREPARATION PRODUCTION LINE
  • GGBS PRODUCTION LINE
  • SUPERPHOSPHATE PRODUCTION LINE
  • MOLECULAR SIEVE PRODUCTION LINE
  • FLUE GAS PURIFICATION SYSTEM
  • FGD SYSTEM
  • SOIL REMEDIATION SYSTEM
  • PHOSPHOGYPSUM DISPOSAL PRODUCTION LINE
  • PHOSPHATE ORE DRESSING LINE
  • PHOSPHATE ORE PELLETIZATION PRODUCTION PROCESS
  • Grinding Mills
  • Kilns & Dryers
  • Granulators
  • Conveyors
  • Crushers
  • Bucket Elevators
  • Project details

    Project Name

    Cement project of Armenia Sifang Industrial Company

    Capacity

    1,000 T/D

    Location

    Armenia

    Project Overview

    Signing date: 2010-04-26

    Processing material: cement

    Processing capacity: 1,000 tons per day

    Equipment configuration: mixing tank, raw material vertical mill, φ3.2x60m rotary kiln, cement vertical mill

    It is reported that the Armenian customer was mainly engaged in petroleum-related products. Due to the influence of the policy, it began to develop infrastructure construction. In order to expand the market share and increase profits, it decided to build a cement plant. After inspections and comparisons in many countries, the Armenian Sifang Industrial Company customer officially signed a cooperation contract with Zhengzhou Mining Machinery for a 1,000-ton daily cement production line project on April 26.

    This cooperation took less than 30 days from the inspection to the signing of the contract. Henan ZK Corp's own technical strength and good reputation in the industry have allowed customers to make a firm choice.

    Project Solution

    A dry-process cement line with a production scale of 1000t/d is expected to be put into operation in 2011, coal mill motor 1250kw, pulverized coal fan 280kw, cement mill 3150kw, cement mill exhaust fan 560kw, cement mill circulation fan 315kw, and 900kw roller press , Two 630kw slag mill fans, two 1600kw slag mill main motors, two 2240 raw material mills, two 630kw limestone crushers, high-temperature fans 2800kw, and kiln head exhaust fans 630kw. Before the transformation, the comprehensive electricity consumption of comparable clinker was 64.05KWh/t, and the comprehensive electricity consumption of comparable cement was 95.84KWh/t, which was less than the limit value and reached the advanced value of national cement enterprises.

    Related Equipment

    Contact Us

    Please leave a message. Get answers next business day.

    Name *

    Email *

    Telephone

    Message *

    Send message & get quote