• LECA PRODUCTION LINE
  • MAGNESIUM PRODUCTION LINE
  • ACTIVE LIME PRODUCTION LINE
  • CEMENT GRINDING STATION
  • CEMENT PRODUCTION LINE
  • LIME SLAKING PLANT
  • MAGNESIUM OXIDE (MgO) PLANT
  • LITHIUM PRODUCTION LINE
  • GYPSUM POWDER PRODUCTION LINE
  • ALUMINUM ASH PROCESSING SYSTEM
  • FRACTURING PROPPANT PRODUCTION LINE
  • SOLID (HAZARDOUS) WASTE INCINERATION SYSTEM
  • PULVERIZED COAL PREPARATION PRODUCTION LINE
  • GGBS PRODUCTION LINE
  • SUPERPHOSPHATE PRODUCTION LINE
  • MOLECULAR SIEVE PRODUCTION LINE
  • FLUE GAS PURIFICATION SYSTEM
  • FGD SYSTEM
  • SOIL REMEDIATION SYSTEM
  • PHOSPHOGYPSUM DISPOSAL PRODUCTION LINE
  • PHOSPHATE ORE DRESSING LINE
  • PHOSPHATE ORE PELLETIZATION PRODUCTION PROCESS
  • Grinding Mills
  • Kilns & Dryers
  • Granulators
  • Conveyors
  • Crushers
  • Bucket Elevators
  • Project details

    Project Name

    NE30 and NE50 Bucket Elevator Equipment for Philippines

    Capacity

    30TPH and 40TPH

    Location

    Philippines

    Project Overview

    Contract date: November 08, 2021

    Feeding materials: Limestone powder

    Capacity: 30TPH and 40TPH

    Equipment: 1set of NE30 bucket elevator / 2 sets of NE50 bucket elevator


    Project Overview:

    The client is from the Philippines and is a local mining and power company. They require one set of 30TPH bucket elevator and two sets of 40TPH bucket elevators. The lifting material is limestone powder, material particle size: 100~14 mesh. 


    Project Solution

    According to the simple layout provided by the customer, some simple parameter requirements are given: production capacity, material particle size, etc. After calculation by the process engineer, NE30 and NE50 plate chain bucket elevators are recommended respectively, and the equipment engineer accordingly issued the basic outline structure drawing to confirm with the customer the important dimension parameters, bucket volume, buckets quantity, etc. on the general drawing. After confirming the drawings and basic parameters, detailed technical and commercial quotations, equipment photos, factory videos, etc. were provided to the customer for reference and understanding.

    Finally, the two parties will sign the contract in early October 2021, and the goods will be delivered successfully in November 2021.Finally, the contract will be signed by both parties in the beginning of October 2021 and the goods was already delivered in November of 2021.