• LECA PRODUCTION LINE
  • MAGNESIUM PRODUCTION LINE
  • ACTIVE LIME PRODUCTION LINE
  • CEMENT GRINDING STATION
  • CEMENT PRODUCTION LINE
  • LIME SLAKING PLANT
  • MAGNESIUM OXIDE (MgO) PLANT
  • LITHIUM PRODUCTION LINE
  • GYPSUM POWDER PRODUCTION LINE
  • ALUMINUM ASH PROCESSING SYSTEM
  • FRACTURING PROPPANT PRODUCTION LINE
  • SOLID (HAZARDOUS) WASTE INCINERATION SYSTEM
  • PULVERIZED COAL PREPARATION PRODUCTION LINE
  • GGBS PRODUCTION LINE
  • SUPERPHOSPHATE PRODUCTION LINE
  • MOLECULAR SIEVE PRODUCTION LINE
  • FLUE GAS PURIFICATION SYSTEM
  • FGD SYSTEM
  • SOIL REMEDIATION SYSTEM
  • PHOSPHOGYPSUM DISPOSAL PRODUCTION LINE
  • PHOSPHATE ORE DRESSING LINE
  • PHOSPHATE ORE PELLETIZATION PRODUCTION PROCESS
  • Grinding Mills
  • Kilns & Dryers
  • Granulators
  • Conveyors
  • Crushers
  • Bucket Elevators
  • Project details

    Project Name

    Inner Mongolia Jin Shi Magnesium Industry 200,000 t/a Mg Project

    Capacity

    200,000 t/a

    Location

    Inner Mongolia

    Project Overview

    Signing date: 2012-07-09

    Processing material: Dolomite

    Processing capacity: 200,000 tons per year

    Equipment configuration: rotary kiln, ball mill, cooler, ball press


    Project overview:

    In March 2012, Jinshi Magnesium started bidding for the rotary kiln calcination system, pulverized coal preparation system, and grinding and ball making system equipment for the whole country, and invited thirteen major domestic equipment manufacturers to participate in the bidding. The owner has conducted extensive comparative investigations many times, and determined that Henan Zhengkuang Machinery is the supplier of the three major systems and equipment. And signed the equipment supply contract on July 9, 2012.


    After the contract comes into effect, our company sets up a project headquarters, strictly implements the 4S management system, strictly abides by the product enterprise technical standards in production and quality inspection, and reports the equipment production progress to the owner in a timely manner. There is a project manager at the equipment installation site, and the on-site project manager communicates with the owner's engineering department in a timely manner to solve various problems existing in the construction process of the project site.


    After the close cooperation and active promotion of both parties, in September 2013, the installation and commissioning of the system equipment was completed and the acceptance was qualified, and the production and production standards were successfully reached.


    Project Solution

    1. Rotary kiln calcination system: choose energy-saving and environmentally friendly rotary kiln with vertical preheater and vertical cooler.

    2. Pulverized coal preparation system: uniform grinding, flexible design and high degree of automation.

    3. Grinding and ball-making system: high forming pressure, adjustable rotation speed of main engine, and equipped with screw feeding device.


    Equipment configuration

    rotary kiln, ball mill, cooler, ball press