• LECA PRODUCTION LINE
  • MAGNESIUM PRODUCTION LINE
  • ACTIVE LIME PRODUCTION LINE
  • CEMENT GRINDING STATION
  • CEMENT PRODUCTION LINE
  • LIME SLAKING PLANT
  • MAGNESIUM OXIDE (MgO) PLANT
  • LITHIUM PRODUCTION LINE
  • GYPSUM POWDER PRODUCTION LINE
  • ALUMINUM ASH PROCESSING SYSTEM
  • FRACTURING PROPPANT PRODUCTION LINE
  • SOLID (HAZARDOUS) WASTE INCINERATION SYSTEM
  • PULVERIZED COAL PREPARATION PRODUCTION LINE
  • GGBS PRODUCTION LINE
  • SUPERPHOSPHATE PRODUCTION LINE
  • MOLECULAR SIEVE PRODUCTION LINE
  • FLUE GAS PURIFICATION SYSTEM
  • FGD SYSTEM
  • SOIL REMEDIATION SYSTEM
  • PHOSPHOGYPSUM DISPOSAL PRODUCTION LINE
  • PHOSPHATE ORE DRESSING LINE
  • PHOSPHATE ORE PELLETIZATION PRODUCTION PROCESS
  • Grinding Mills
  • Kilns & Dryers
  • Granulators
  • Conveyors
  • Crushers
  • Bucket Elevators
  • Project details

    Project Name

    Zhejiang Lishui Hazardous Waste Incineration Project

    Capacity

    15,000 t/a

    Location

    Zhejiang, China

    Project Overview

    Project Site: Lishui, Zhejiang

    Processing Capacity: 15,000 t/a

    Contract Signed: August 27, 2019

    Processing Material: Medical waste

    Project Solution

    The owner of the project is Zhejiang Lishui Mingkang Medical Waste Treatment Co., Ltd. The project is located in the factory area of Lishui Minkang Medical Waste Treatment Co., Ltd. The contract was signed on August 27, 2019, and construction started on December 10, 2019. Design The annual processing capacity is 15,000 tons, and the annual operating time is 7,200 hours.

    Related Equipment

    Contact Us

    Please leave a message. Get answers next business day.

    Name *

    Email *

    Telephone

    Message *

    Send message & get quote