• LECA PRODUCTION LINE
  • MAGNESIUM PRODUCTION LINE
  • ACTIVE LIME PRODUCTION LINE
  • CEMENT GRINDING STATION
  • CEMENT PRODUCTION LINE
  • LIME SLAKING PLANT
  • MAGNESIUM OXIDE (MgO) PLANT
  • LITHIUM PRODUCTION LINE
  • GYPSUM POWDER PRODUCTION LINE
  • ALUMINUM ASH PROCESSING SYSTEM
  • FRACTURING PROPPANT PRODUCTION LINE
  • SOLID (HAZARDOUS) WASTE INCINERATION SYSTEM
  • PULVERIZED COAL PREPARATION PRODUCTION LINE
  • GGBS PRODUCTION LINE
  • SUPERPHOSPHATE PRODUCTION LINE
  • MOLECULAR SIEVE PRODUCTION LINE
  • FLUE GAS PURIFICATION SYSTEM
  • FGD SYSTEM
  • SOIL REMEDIATION SYSTEM
  • PHOSPHOGYPSUM DISPOSAL PRODUCTION LINE
  • PHOSPHATE ORE DRESSING LINE
  • PHOSPHATE ORE PELLETIZATION PRODUCTION PROCESS
  • Grinding Mills
  • Kilns & Dryers
  • Granulators
  • Conveyors
  • Crushers
  • Bucket Elevators
  • Project details

    Project Name

    GL400×350 Double Roller Granulator Equipment

    Capacity

    0.5-1T/h

    Location

    Jiangsu

    Project Overview

    Signing date: 2021/6/23

    Product Name: roller granulator

    Processing Capacity: 0.5-1T/h

    Equipment Configuration: φ400 × 350 double roller granulator

    The main purpose of this project is to change the structure of the roller granulator by 30%-35% water-containing sludge of the owner to improve the granulating efficiency and granulating effect.

           This equipment mainly improves the sludge granulation section in the key technology research and equipment development experiment project of Jiangsu Dadi Yiyuan smoldering (STAR), and improves the sludge granulation equipment with high water content.



    Project Solution

    1. Adopting the combination structure of bachelor and one side of roller with holes solves the problem that the sludge contains too much water and the granulating and bonding problem.

    2. High production efficiency, with a ball-forming rate of over 90%;

    3. The discharge is uniform, and the size of the sludge particles squeezed by the roller granulator is uniform, which can meet the requirements of the lower-end process on the size and shape of the sludge;

    4. The overall operation of the equipment is stable and the noise is low. At the same time, the sealing cover is adopted to receive materials. The work site is clean and tidy, and the operation is convenient.


    Related Equipment

    Contact Us

    Please leave a message. Get answers next business day.

    Name *

    Email *

    Telephone

    Message *

    Send message & get quote